Before start-up
The last sixty days decide the date.
Projects are lost between mechanical completion and first fire because the last sixty days were never planned system by system. Torvane measures whether they have been, and installs the process if they have not.
Commissioning and Turnover Readiness Review
Systemization and turnover sequence, punch and preservation status, commissioning spares and vendor presence, permit-to-work and simultaneous operations, operations team readiness, and the handover documents the operator will actually accept.
On site, six days · Deliverable: system-by-system readiness scorecard, sequence conflicts, first-fire or first-gas critical actions
Start-up Readiness Program
Designs and installs the client's own readiness process: gate criteria, walkdown standard, war-room cadence, turnover package standard, and the dashboard. Torvane installs; the client runs it.
On site, scope set with the client · Optional governance: two days per month through first fire
Scope boundary
We do not perform commissioning, operate equipment, or accept systems. The client and its contractors retain every decision.
Get the readout before the next commitment.
Fixed scope. Defined timeline. Principal-led. A confidential 30-minute call is enough to tell you whether an assessment fits.